Caps, labels and pallets: six decisions before you order
The bottle is the easy part. What actually delays a shipment is the closure, the label and the pallet — a practical checklist.

Ordering bottles is straightforward. Delays almost never come from the bottle — they come from everything around it. Six decisions, with the answer we recommend for each.
1. Cap type
Three options: plain screw cap (cheapest), pourer (restaurants, HoReCa), tamper-evident (brand protection, and the right call for cold-pressed oils). Caps are a separate line item. Standard colours: gold, black, green, white.
2. Neck diameter
All nine SKUs share a standard screw neck, and we send a drawing per mould. If you buy caps elsewhere, compare the drawing before ordering — a cap that does not seal is not returnable after filling.
3. Label size
We do not print labels, but we check the size. Flat panel for square, wrap for round. For cold shelves use a different adhesive than for dry shelves — this is the most common label failure in the region.
4. Carton
Standard cartons come in our dimensions with dividers and can be printed. Custom cartons usually start at 500–1 000 pcs, which can exceed the bottle minimum on a test order.
5. Pallet
Export requires ISPM-15 heat-treated pallets with the stamp. Plastic pallets are allowed but add weight and change the container maths — check before you promise a loading plan.
6. Sample
3–5 pcs with caps. Sample cost is deducted from the order. Ordering a container without a sample is the most expensive mistake in this business, and the most common.
Checklist
- Cap type and colour approved
- Neck drawing checked against your cap supplier
- Label size and adhesive confirmed
- Carton design ready (or standard chosen)
- Pallet type agreed, ISPM-15 confirmed
- Technical file for the EAC declaration assembled
Close these six and production runs in 15–25 days. Leave one open and the container waits at the port.
Build your oil range on one mould
Send the volume and the city — we reply with pricing, carton and pallet options within one working day.